News

Moama 5MW Solar Farm & BESS development

Risen Energy Australia is developing a proposal for a small-scale 5MW solar farm including a small-scale battery energy storage system (BESS) in Moama, NSW. 

The proposed small scale solar farm with battery energy storage system development site is to be located within lot 590 Hillside Road, Moama NSW. The site is approximately 7km north of Moama town centre and across from the Moama Waste Management Facility.

Construction is currently forecast for the second half of 2022 which may take between 10-12 months to become operational.

Scroll to Top